- Pile foundations.
- Insulated ground floor slab.
- Structural steel frame.
- Pre-caste concrete upper floors with structural topping.
- External Walls - Cavity brick and block work construction.
- External wall finish - Light fair faced bricks.
- Roof - Insulated flat roof.
- External windows and doors - Velfac aluminum double glazed units.
- Internal walls - Block works with smooth plaster finish.
- Stairs - Concrete.
- Floor finishes - Raised metal floors to office areas.
Timber floor finishes to lobbies and staircases.
Stone/ceramic floor tiling to toilets.
- Ceilings - Suspended plasterboard with smooth plaster finish.
- Mains Supply - Three phase 100 A.
- Small power - All perimeter of all office areas, lobby
and stairwells.
- Lighting - Low energy fluorescent fittings to office
areas.
Low voltage halogen down lighters to entrance lobbies, toilets and stairs.
- Comfort cooling & heating to office areas - A two
pipe direct refrigerant VRV system.
- Electric heating to stairs and entrance lobby and toilets
- Wall mounted convector heaters.
- Emergency lighting and fire alarm system.
- Lifts - An eight person Kone 'Monospace' passenger
lift serving all floors for each building.
- White sanitary ware.
- Kitchenettes - provision for services for kitchenettes.
The specification may be subject to change.
|