Specification

  Structure
  1. Pile foundations.
  2. Insulated ground floor slab.
  3. Structural steel frame.
  4. Pre-caste concrete upper floors with structural topping.

  External Fabric

  1. External Walls - Cavity brick and block work construction.
  2. External wall finish - Light fair faced bricks.
  3. Roof - Insulated flat roof.
  4. External windows and doors - Velfac aluminum double glazed units.

  Internal Fabric and Finishes

  1. Internal walls - Block works with smooth plaster finish.
  2. Stairs - Concrete.
  3. Floor finishes - Raised metal floors to office areas.
    Timber floor finishes to lobbies and staircases.
    Stone/ceramic floor tiling to toilets.
  4. Ceilings - Suspended plasterboard with smooth plaster finish.

  Services
  Mechanical & Electrical

  1. Mains Supply - Three phase 100 A.
  2. Small power - All perimeter of all office areas, lobby and stairwells.
  3. Lighting - Low energy fluorescent fittings to office areas.
    Low voltage halogen down lighters to entrance lobbies, toilets and stairs.
  4. Comfort cooling & heating to office areas - A two pipe direct refrigerant VRV system.
  5. Electric heating to stairs and entrance lobby and toilets - Wall mounted convector heaters.
  6. Emergency lighting and fire alarm system.
  7. Lifts - An eight person Kone 'Monospace' passenger lift serving all floors for each building.

  Toilet Sanitary Ware to Toilets

  1. White sanitary ware.
  2. Kitchenettes - provision for services for kitchenettes.

The specification may be subject to change.